What size transformer should be equipped for a 2-ton medium frequency furnace (medium frequency induction heating furnace)?
What is the appropriate capacity transformer for a 2T medium frequency furnace configuration (selection)?
(The following content is provided by Luoyang Xingniu Transformer)
As the main equipment for steel smelting, how to reasonably configure transformers to achieve optimal energy-saving effects in medium frequency furnace smelting is also a concern for many users! Let’s briefly discuss the optimal transformer configuration scheme for the intermediate frequency furnace:
1、 Firstly, determine whether the intermediate frequency furnace has 6 pulses, 12 pulses, or 24 pulses; Since 2013, the government has implemented regulations and casting admission policies for high energy consuming enterprises. It is recommended to use a 12 pulse medium frequency furnace for 750kg to 5T medium frequency furnaces to reduce power grid harmonics in accordance with national laws and policies.
2、 Next, determine the power of the 2-ton intermediate frequency furnace equipment, with intermediate frequency power mostly ranging from 1200KW to 1300KW.
3、 Determine the voltage level, usually 10KV for the first time; 400V, 575V, 660V or 750V, 850V for the second time.
Conclusion:
According to the power of 2T medium frequency furnace equipment, ordinary rectifier transformers should use 1600KVA or 1800KVA transformers.
recommend
The recommended transformer for a 2-ton medium frequency furnace is the “Star Bull” 800KVA medium frequency furnace dedicated transformer! For details, please consult our company’s technical department. We will provide you with a tailored energy-saving transformer (phone: 13700791131, Manager Liu)
Use case of 2-ton medium frequency furnace:
2T series intermediate frequency melting furnace selected by a casting enterprise in Hefei, Anhui
Ordinary transformers should be configured with 1600KVA or 1800KVA rectifier transformers
The customer has chosen Xingniu Special Transformer energy-saving transformer with a capacity model of 800KVA
Melting time: 45 minutes
Melting capacity: 2.1T