Quality Control and Reliable Delivery
XNET combines controlled manufacturing, routine testing and documented inspection to support reliable transformer performance. Quality requirements are confirmed at the technical review stage and followed throughout production.
Inspection and Testing
- Winding resistance and voltage-ratio tests
- Vector-group and polarity verification
- Insulation resistance and dielectric tests
- No-load loss, load loss and impedance measurement
- Leakage inspection and accessory checks for oil-immersed units
- Additional type or special tests when required by the contract
Documentation
Projects can be supplied with approved drawings, test reports, packing lists, operation manuals and other agreed quality documents. Third-party inspection can be coordinated when specified.
Packing and Delivery
Each transformer is prepared for transport according to its size, route and destination. Accessories are identified and packed for site installation, while shipping documentation is coordinated with the agreed delivery terms.
